Adjustable spring dampers are installed in Beijing Olympic Sports East
Our company produce a variety of din rubber expansion ,flanged expansion bellows, adjustable spring dampers and other products, providing high-quality adjustable spring dampers .We will do our best to provide you with the best serviceabsorbers and unit spring shock absorbers for the Beijing Olympic Sports South Bus East Station Project.
Firstly, On October 29, 2014, the scanned copy of the contract for the construction site of the Olympic East Bus Station in the South Olympic Sports District, Chaoyang District, Beijing:
Secondly, On October 29, 2014, the Songjiang unit adjustable spring dampers was used in the site contract of the Olympic Sports East Bus Station Project in the South Olympic Sports District, Chaoyang District, Beijing
1. Adjustable spring dampers are designed with low frequency value and sprayed with plastic, which has good weather resistance and shockproof effect.
2. The top and bottom are made of anti-skid wear-resistant rubber and fixing bolts, which greatly improves the safety performance.
3. The installation is simple and the level and height can be adjusted according to the actual needs.
4. It can effectively isolate the vibration of large power equipment such as water chiller, cooling tower, heat pump unit, generator unit, and protect and extend its service life.
5. Note: – 1 is a set of spring combinations, – 2 is two sets of spring combinations, – 4 is four sets of spring combinations, – 6 is six sets of spring combinations, and – 9 is nine sets of spring combinations.
6. Main uses: all kinds of heavy machinery, ice water host, cooling water tower, fire pump, exhaust fan generator, air compressor
Third、 October 29, 2014, Beijing Chaoyang District Olympic Sports South Bus East Station Project Introduction: (The following information is from the network)
Thirdly,Olympic Sports Center Stadium: It will undertake modern pentathlon equestrian and running competitions in the 2008 Olympic Games, and will produce two gold medals. The Olympic Sports Center Stadium is a reconstruction and expansion project. 1.The total construction area after reconstruction and expansion is 37000 square meters, which can accommodate 40000 spectators. The construction of the main structure of the project has been completed and will be completed and delivered for use at the end of July 2007.
2. Beijing Olympic Sports Center is a multifunctional stadium. There are 5748 audience seats, with a total construction area of 25300 square meters. The plane shape of the stadium is hexagonal. The north side of the first floor is the rooms for internal and external VIP guests, security, film and television, news bulletin reporter work, telecommunications and computer services. The second floor is the audience entrance and lounge. The east and west sides of the third floor are the time and score board and the office lounge. The competition hall adopts high luminous efficiency scandium sodium lamp, and uses medium-width light distribution lamps to arrange lamps from both sides, a total of four rows, to strengthen the vertical illumination. Venue name: Olympic Sports Center Stadium.
3. Event: modern pentathlon (running and equestrian), location: south of the National Olympic Sports Center, venue type: reconstruction and expansion of the venue, use during the Olympic Games: modern pentathlon (running and equestrian), use during the Paralympic Games: none, building area: 37052 square meters, fixed seating: 38000, temporary seating: 2000, construction commencement date: April 1, 2006, Planned completion time: the second half of 2007.
4. With the gradual opening of lighting windows and electric windows, the bright sunlight shines into the stadium, and the fresh air makes people feel particularly fresh. Thanks to the newly installed louvers, the overall environment of the main hall of the stadium is bright, broad and simple, and the good natural ventilation measures not only bring a comfortable activity environment for the audience, but also save energy and add a sense of modernity. In addition, the roof of the audience rest hall on the south side of the second floor of the gymnasium adopts the integral glass roof, which is both modern and reduces the building energy consumption, making people refreshing.
5. More than 2500 street lamps on the 18 main roads in the elegant and warm color seats in the Olympic Sports Center have been installed and have begun to enter the operation adjustment stage. The “intelligent street light” in the Olympic Sports Center adopts a unique torch shape design, which is energy-saving. On the premise of ensuring the brightness, advanced light sources are selected, which can save 40% energy than ordinary light sources. A single street lamp can be controlled remotely and the lighting can be adjusted according to the weather. This is the streetlight newly installed by workers on May 15.
Related links:SHA-M-1000 Cooling Water pump damping Spring Vibration Isolator